Commonwealth Ave Bridge
Client:
Walsh Construction
Owner:
MassDOT
Status:
Phase 1 - Complete, Phase 2 - Completed Summer 2018
Location:
Boston, MA
ACD performed the first phase of this bridge which consisted of over 35,000 SF of bridge in 60 hours. ACD worked around the clock to ensure that the demolition was fully completed so the new bridge could be built. ACD performed Stage 2 demolition starting July 28, 2018 and completed Span 3 on August 3.