< Back to Bridge
Fore River Bridge
Client:
JF White/Skanska JV
Owner:
MassDOT
Status:
On-Going
Location:
Quincy, MA
Removal of Temporary ACROW Bridge over the Fore River in Quincy/Weymouth. ACD also removed existing piers and piles in the water. ACD utilized a 650 Ton crane equipped with 244 feet of boom for removal of the ACROW components. This was the only ACROW lift span bridge in the world.