< Back to Bridge
Sarah Long Bridge
Client:
Cianbro
Owner:
MaineDOT
Status:
Completed
Location:
Portsmouth, NH and Kittery, ME
Removal of an existing steel lift span bridge over the Piscataqua River connecting Portsmouth, NH to Kittery, ME. ACD performed the removal of the approach spans, trusses, lift span, towers and all associated foundations. Explosives were utilized to demolish the existing piers in the river.