< Back to Bridge

Andover Bridge

Client: MAS Building & Bridge, Inc. Owner: MassDOT Status: On-Going Location: Andover, MA

The removal of the existing bridge carrying Route 28 over the MBTA Railroad. Work was performed on weekend shutdowns of the Commuter Rail. ACD removed existing deck, sidewalks, plate girders, floorbeams and portions of each abutment.